I was _planning_ so much, connecting up the door switches on the bedrooms, getting the last two DRB's in place, getting the boiler networked.
But I didn't do any of that. My sole HA action for the weekend was getting two surplus X-10 units onto eBay. Still, the massive clearout has made some space and put some brownie points in the bank ... so more to come.
Actually, now I think about it, I did capture the codes from 8 remote controls into Cortex and get some xPL stuff going ...
... and I got the modem connected and had a play with telephony too. Perhaps it's more accurate to say I didn't finish anything.